DTH Casing Tube with Round-Thread Connection
The DTH casing tube is the load-bearing tubular component in simultaneous casing drilling systems, directly withstanding impact energy, retaining borehole walls, and being recovered for reuse. This product features a round-thread connection with reduced stress concentration at the thread root, offering superior galling resistance compared to conventional trapezoidal threads under repeated make-and-break cycles in high-frequency impact conditions. Wall thicknesses available: 8mm, 10mm, 12mm, 14mm, 16mm . Material options include P110 and other high-grade steels. Outer diameters cover 127mm, 146mm, 168mm, 194mm, and 219mm , allowing flexible selection based on overburden thickness and hole diameter requirements.
Design Advantages & Field Value
The round-thread profile distributes contact stress more evenly along the thread flank, minimizing thread loosening and fatigue damage caused by impact vibration during casing advancement. P110-grade material, properly quenched and tempered, provides a balanced combination of yield strength and impact toughness suitable for mixed-face conditions where medium-hard rock alternates with fractured zones . The product is designed for retrieval and repeated use : after the inner drill string is withdrawn at final depth, the casing is extracted intact using a hydraulic casing puller and redeployed at the next hole, substantially reducing per-hole tubular amortization costs.
Applicable Engineering Scenarios
1. Water Wells & Monitoring Wells
In overburden, sand-gravel formations, and weathered bedrock, the casing advances with the bit to stabilize the borehole, then is pulled after completion. Suitable for full-depth water well construction from surface to bedrock, particularly for drilling crews requiring multiple casing turnovers
.
2. Slope Anchoring & Geohazard Remediation
In landslide treatment and anchor cable installation, fractured ground tends to collapse. The DTH casing advances to design depth, the anchor is installed inside, and the casing is either extracted after grouting or left in place—ensuring hole completion and site safety
.
3. Highway/Railway Subgrade & Tunnel Forepoling
For pipe-roof support and advanced small-pipe installation, overburden and fault zones require casing to maintain an open hole. The round-thread connection allows quick make-and-break in confined workspaces, compatible with short-stroke feed systems on forepoling rigs
.
4. Mine Overburden & Tailings Investigation
In open-pit overburden drilling and tailings dam site investigation, casing prevents borehole collapse and bit burial. P110 grade withstands the high-frequency impact of the DTH hammer, reducing tube bending and thread damage.
5. Trenchless Pipeline Installation
For cable, telecom duct, water, and sewer crossings beneath roads and structures, simultaneous casing drilling creates a continuous stable bore. After the casing is withdrawn, the product line is pulled through, and the casing is recovered for the next crossing
.
Selection Guide (OD — Wall Thickness — Typical Application)
| OD | Recommended Wall | Typical Application |
|---|---|---|
| 127mm | 8–10mm | Shallow water wells, seismic shot holes, short anchors |
| 146mm | 10–12mm | Slope anchoring, road forepoling, medium-depth wells |
| 168mm | 10–14mm | Tunnel forepoling, mine site investigation |
| 194mm | 12–16mm | Deep water wells, large anchoring projects |
| 219mm | 14–16mm | Large-diameter wells, deep holes in complex overburden |